PRODUCTS CENTER
Haiti LIANLI Water Cooling Bitcoin Mining Containers | Whatsminer M53 /M63 /M73 / M79 Series
Category:
HaitiProduct Display
HaitiCrypto Mining Liquid Cooling System
HaitiFor whatsminer hydro series
Phone:+86-400-852-9767
Product Description
Bitcoin Mining Containers | Whatsminer M53/M63/ M73 / M79 Series
Purpose-built for Whatsminer hydro miners, optimized for large-scale Bitcoin mining operations.Advanced dual-loop water cooling technology ensures stable temperatures below 25°C, maximizing hash rate efficiency.Modular design supports rapid deployment of 200 mining units per container, reducing downtime and infrastructure costs.
Key Features
- 40% Cooling Efficiency Boost: Dual-pump water circulation and external heat dissipation eliminate thermal throttling.
- 30% Energy Savings: Outperforms traditional air cooling systems, reducing power consumption by 5kW per container.
- Plug-and-Play Setup: Pre-assembled components enable full deployment within 72 hours.
- Smart IoT Monitoring: Real-time temperature alerts and remote diagnostics via integrated sensors.
Technical Specifications
Parameter | Details |
|---|---|
Compatibility | Whatsminer M53/M63 /M73 /M79 Series |
Capacity | 240 Mining Units |
Cooling Method | Dual-loop water cooling + Auxiliary air cooling |
Power Consumption | ≤5kW (Full Load) |
Operating Temp | -4°F ~ 122°F (-20°C ~ 50°C) |
Material | Galvanized Steel + Fireproof Layer |
Use Cases
Large Mining Farms: Scale to 1,000+ units with centralized cooling management.
High-Temperature Regions: Ensure stable operations in hot climates (e.g., Middle East, Southeast Asia).
Low-Cost Energy Zones: Pair with renewable energy (hydro/wind) for maximum ROI.
NOTES
1. 240units antminer container is only suitable for M53S/ M63 /M73/ M79 series of original hydro-cooled mining machines
2. The pictures shown are for reference only; the final shipment version shall prevail.
3.If you want to learn more about the btcoin water cooling system, please click here
SHIPPING DETAILS
1. Shipments will be scheduled on a first-paid-first-ship basis for orders on which lianli has received full payment.
2. You are responsible for any customs delays or returned shipments due to a lack of proper documentation. It's highly recommended to be aware of local customs clearance policies and prepare all customs documentation ahead of time to avoid delays or unexpected costs.
Return and exchange policy:
1. Domestic customers: Within 7 days of receiving the goods, our quality department confirms that it is a product quality problem;
2. Overseas customers: Within 15 days of receiving the goods, our quality department confirms that it is a product quality problem;
3. The outer packaging is damaged, and abnormalities occurring during transportation are not within the scope of return or exchange (please contact the freight company for claim settlement, and our company can assist with claim settlement);
4. We only provide after-sales service to customers who purchase directly. If you purchase our products from a dealer or a third party, please contact the seller for after-sales service;
5. The product cannot be disassembled after receipt, and cannot be modified or repaired without our permission. Keep the outer packaging and keep the labels intact, otherwise no after-sales service will be provided.