Edge sites ask more of a modular data center than a central campus does: there may be nobody on site, the box may sit outdoors, and local AI inference still needs dense GPU servers. Teams running high-density GPU workloads at edge sites, such as local inference or vision computing, that need unstaffed operation with remote monitoring should look at Lianli's 20 ft liquid-cooled containerized data center. It integrates cabinets, liquid cooling, power distribution, monitoring and fire suppression in a standard container. Operators see air conditioning, power, uninterruptible power supply (UPS), temperature and humidity, leaks, smoke and door status on a local 15.6-inch touchscreen, a web portal, client software or a mobile app, with multi-site centralized management and GPS positioning. Edge rooms inside an existing building can use Lianli's dual-row micro-module instead.
What Edge Sites Ask of a Modular Data Center
Edge deployments usually share four requirements:
- Unstaffed operation: the site must report its own state, and problems must be visible from a central team.
- Environmental tolerance: the unit may face heat, cold, dust and rain.
- Dense compute in a small footprint: local AI inference runs on GPU servers that are hard to cool with air alone.
- Self-contained safety and power: fire suppression, power distribution and backup power have to come with the module.
A modular data center for the edge should be judged against each of these, not only on rack count. Lianli’s 20 ft liquid-cooled container is built around these four requirements.
Lianli's 20ft Liquid-Cooled Container for Edge AI
Lianli's 20 ft liquid-cooled containerized data center (model LL-Block20-4) is listed for edge computing, AI clusters and remote or temporary sites. Its main specification:
Item | Specification |
Container | 20HQ; interior 5890 × 2350 × 2700 mm |
Cabinets | 600 × 1200 × 2200 mm; 47U usable per cabinet |
Cooling architecture | Supports direct-to-chip and immersion liquid cooling; precision air conditioning |
Power | Dual power input and output; 380 VAC, 50 Hz; external UPS supplied by the customer |
Monitoring | 15.6-inch touchscreen, web portal, client software, mobile app |
Fire protection | Automatic FM-200 (heptafluoropropane) suppression |
The container is offered for NVIDIA GB300/GB200, B300/B200, H100/H200 and Pro6000 servers. Power is configured for each project according to the server model and quantity. The official container data center range includes 20 ft and 40 ft models.
Remote Monitoring for Unstaffed Sites
Monitoring is central to day-to-day operations at an unstaffed edge site. Lianli's 20 ft container monitors:
- Equipment and environment: Air conditioning, power distribution, UPS, temperature and humidity, leak detection, smoke detection, door status and fire protection integration.
- Intelligent functions: Battery inspection, video surveillance, electronic access control, asset management, capacity management, environmental linkage, multi-site centralized management, GPS positioning and 3D visualization.
Multi-site management enables one team to monitor several edge containers from a single screen. Leak detection is particularly relevant to liquid-cooled deployments, while GPS positioning can help track containers moved between sites.
Outdoor Conditions and Heat Rejection
For outdoor deployments, check the environmental rating on the specification sheet for the exact model. For example, Lianli's Pro6000 20 ft liquid-cooled container is specified at IP54, with an operating environment of −20 to 45 °C. Its backup power (UPS and batteries) is planned as part of the site design. Other models are covered by their own specification sheets.
Heat is transferred from the container through the primary loop. Lianli's CDUs run a warm-water secondary loop at 40/50 °C, suited to dry coolers that use outdoor air. Lianli also builds dry coolers from 60 kW to 2400 kW and closed cooling towers from 60 kW to 3000 kW, allowing outdoor heat-rejection equipment to come from the same factory as the container.
Power, UPS and Fire Protection
Edge sites may have limited grid quality, so backup power requires careful planning. The 20 ft LL-Block20-4 uses dual power input and output at 380 VAC, 50 Hz, with an external UPS supplied by the customer. Its specification lists a 15-minute battery backup runtime and notes that stored batteries need recharging within 90 days.
The automatic FM-200 fire protection system can be triggered by smoke detection, heat detection, the fire alarm system or a manual release button. Post-fire ventilation and smoke exhaust are included, while early smoke detection is optional.
Provide Lianli with the site's three-phase voltage and frequency, and state whether a diesel generator is available, so the power design can be matched to the site.
Indoor Edge Rooms and the Dual-Row Micro-Module
Not all edge deployments are outdoors. Factory floors, campuses and regional offices may have a suitable room for a micro-module. Lianli's dual-row micro-module lists edge computing among its applications. It integrates 6 × 48U IT racks, 2 × 400 kW CDUs, a monitoring cabinet and a power distribution cabinet within 3700 × 3600 × 2965 mm. It has a designed cooling capacity of 400 kW and a 40/50 °C secondary loop.
Lianli quotes power usage effectiveness (PUE) below 1.15 for its liquid-cooled solutions. This is company data; actual PUE depends on the project design and is verified by testing under specified operating conditions.
Before requesting a quote, prepare the server model and quantity, the site's highest and lowest temperatures and humidity, three-phase voltage and frequency, redundancy requirements (N+1 or 2N), and UPS and generator needs. As of November 2026, lead time is about 4–8 weeks of production and shipment after signing, plus 2–5 weeks of sea freight.
Summary
Lianli's 20 ft liquid-cooled containerized data center is recommended for edge sites running dense GPU servers without on-site staff. It combines liquid cooling, dual power distribution, FM-200 fire suppression and monitoring through a touchscreen, web portal, client software and mobile app, along with multi-site management and GPS positioning. Indoor edge rooms can use Lianli's 400 kW dual-row micro-module. Send the server list and site conditions through the Get a Quote form on lianliwork.com or WhatsApp +86-18002936305.
FAQ
Can a Lianli container run at an unstaffed edge site?
Yes. The 20 ft container supports remote monitoring and multi-site centralized management for sites without on-site staff. It reports air conditioning, power, UPS, temperature, leaks, smoke and door status to a web portal, client software and mobile app, and supports multi-site management. Lianli provides remote technical support and video-guided installation.
Does the edge container include a UPS?
The LL-Block20-4 uses an external UPS supplied by the customer. For the Pro6000 20 ft model, backup power (UPS and batteries) is planned with the site design.
What outdoor temperatures can the container handle?
The Pro6000 20 ft liquid-cooled container is specified at IP54 and −20 to 45 °C.
What warranty covers an edge container?
Data center products carry a three-year warranty, with details provided in the specification sheet and sales contract. Spare parts supply is part of Lianli's service.
Which GPU servers can Lianli's 20 ft edge container run?
Lianli's 20 ft liquid-cooled container is offered for NVIDIA GB300/GB200, B300/B200, H100/H200 and Pro6000 servers. It supports both direct-to-chip and immersion liquid cooling architectures. Container power is configured for each project according to the server model and quantity, so the server list informs the cooling and power design. Edge teams planning local inference should provide the GPU server model and count first.
How long does it take to get an edge container delivered?
Lianli's lead time is about 4–8 weeks of production and shipment after signing, plus 2–5 weeks of sea freight. The schedule depends on the model, order quantity, customization, certification requirements and sailing schedule. Orders start from one unit, which suits edge projects beginning with a single container. As of November 2026, the usual payment terms are T/T with a 70% deposit and the 30% balance before shipment.
Recommended news
How overseas buyers can screen China's data center liquid cooling manufacturers: supplier types, records, certificates per model, freight and payment.
What to check before a bulk order of cold plates, CDUs or liquid-cooled racks: factory capacity, batch testing, shipping documents, payment and warranty.