搜索历史清除全部记录
最多显示8条历史搜索记录噢~
全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册
+
  • 40尺算力方舱2.0MW浸没式.jpg

40ft Immersion Mining Container | Antminer S21 Imm/ S21 XP Imm/Avalon A1366I-122T

immersion cooling container | 2MW

Price


Category: power supply

Cumulative views

1792

Quantity
-
+

Stock

隐藏域元素占位

  • Description
  • Specifications
    • Commodity name: 40ft Immersion Mining Container | Antminer S21 Imm/ S21 XP Imm/Avalon A1366I-122T
    • Commodity ID: CA-03

    immersion cooling container | 2MW

    40FT Immersion Mining Container 2MW | Immersion Cooling Miner

    1. Revolutionary breakthrough in thermodynamics

    200-260 servers are deployed in an immersed manner, and a single box carries a power load of 2.0MW

    304 stainless steel cooling pipes + military-grade seals, corrosion resistance is improved by 8 times

    Supports dry cooler/closed tower dual mode, and maintains PUE≤1.08 in a high temperature environment of 45℃

     

    2. Silent high-density model

    Fully sealed operation noise <75dB

    12196×2438×2896mm standard box realizes the deployment of 200+ computing units

    Saved more floor space than traditional air-cooled data centers

     

    3. Intelligent operation and maintenance ecology

    Multi-language control system (Chinese/English/customized) seamlessly connects to global teams

    Mobile APP real-time monitoring of liquid temperature/flow/leakage value

    Cooling system self-diagnosis engine, fault response speed increased by 90%

     

    40ft immersion cooling container application scenarios

     

     

    Specifications

    Application Scenario

    Supercomputing center / AI training cluster / high-density GPU server cluster

    Core Advantages

    Ultra-large heat dissipation / high-density deployment / low-decibel operation

    Seat Capacity

    200-260 Units

    Size

    12196*2438*2896MM

    Support Power

    2.0MW

    Cooling Accessories

    Dry Cooler / Closed Cooling Tower

    Pipe Material

    304 Stainless Steel

    Operation and Maintenance

    Remote APP monitoring and control

    Control System Language

    Chinese/English/Customizable

     

     

    FAQ About immersion mining container

    1.What are the main advantages of an Immersion mining container compared to air-cooled systems?

    They offer superior cooling, which allows for higher performance (overclocking), reduced energy consumption for cooling fans, and better protection for the miners from dust and noise.


    2.Can I fit standard Immersion mining container with miners into a typical setup?

    Yes, these containers are designed to be scalable and can typically house hundreds of miners. The immersion environment is key to increasing miner density compared to air-cooled installations.

     

    3.What is the estimated initial investment cost for a Bitcoin mining immersion cooling container?

    The initial investment varies widely based on size and capacity, ranging from approximately $20,000 to over $375,000 for a fully-equipped 20ft or 40ft commercial container, not including the miners or cooling fluid.

     

    SHIPPING DETAILS

    1. Shipments will be scheduled on a first-paid-first-ship basis for orders on which lianli has received full payment.

    2. You are responsible for any customs delays or returned shipments due to a lack of proper documentation. It's highly recommended to be aware of local customs clearance policies and prepare all customs documentation ahead of time to avoid delays or unexpected costs.

     

    Return and exchange policy:

    1. Domestic customers: Within 7 days of receiving the goods, our quality department confirms that it is a product quality problem;
    2. Overseas customers: Within 15 days of receiving the goods, our quality department confirms that it is a product quality problem;
    3. The outer packaging is damaged, and abnormalities occurring during transportation are not within the scope of return or exchange (please contact the freight company for claim settlement, and our company can assist with claim settlement);
    4. We only provide after-sales service to customers who purchase directly. If you purchase our products from a dealer or a third party, please contact the seller for after-sales service;
    5. The product cannot be disassembled after receipt, and cannot be modified or repaired without our permission. Keep the outer packaging and keep the labels intact, otherwise no after-sales service will be provided.

Recommend for you


ORV3-RACK-440U OCP Open Rack V3 Liquid Cooling Ready Rack

$

~

$


ORV3-RACK-440U OCP Open Rack V3 liquid cooling ready rack. 440U high density, 48V bus bar, DLC-ready for AI data center and HPC clusters.
< 1234...31 >