搜索历史清除全部记录
最多显示8条历史搜索记录噢~
全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册
+
  • 20-Foot Liquid-Cooled Containerized Data Center.webp
  • data center liquid cooling(1770257785450).webp
  • Containerized Data Center(1776062226582).webp

20FT Liquid-Cooled Containerized Data Center | Modular/Prefabricated Containerized Data Center

Liquid-Cooled Containerized Data Center | 20FT

Price


Category: power supply

Cumulative views

186

Quantity
-
+

Stock

隐藏域元素占位

  • Description
  • Specifications
    • Commodity name: 20FT Liquid-Cooled Containerized Data Center | Modular/Prefabricated Containerized Data Center

    Liquid-Cooled Containerized Data Center | 20FT

    20ft Liquid-cooled Containerized Data Center | Compatible With All NVIDIA Models

    20-foot liquid-cooled data center container is a modular solution that highly integrates servers, liquid cooling systems, and auxiliary infrastructure into a standard shipping container. It enables rapid deployment and achieves ultra-low energy consumption, with a PUE as low as 1.15.Designed for high-density, rapidly deployable infrastructure, it meets the growing demands of Artificial Intelligence (AI) computing, High-Performance Computing (HPC), and next-generation data center workloads. This fully integrated, prefabricated system offers a flexible and sustainable choice for the era of high-performance computing.

     

    Lianli’s liquid-cooled container data centers support customization and are compatible with all mainstream server models, including NVIDIA’s GB200/GB300,B200/B300 H100/H200 series, as well as products from AMD, Intel, Huawei, and others.

     

     

     

    Specification:

    CategoryItemSpecification
    OverviewProduct ModelLL-Block20-4
    Container Type20HQ Container
    Performance Internal Container Dimensions (L × W × H)5890 × 2350 × 2700 mm
    IT Cabinet QuantitySpecific Requirements
    Supported IT LoadSpecific Requirements

     

    Cabinet

     

    Cabinet Dimensions (L × W × H)600 × 1200 × 2200 mm
    Available IT Space47U Usable Space per Cabinet

     

    Cooling System

     

    Air ConditionerPrecision Air Conditioning, Cabinet Size: 600 × 1200 × 2200 mm
    Cooling ConfigurationSplit-Type Air Conditioning, 18 kW Cooling Capacity per Unit, 36 kW Total Cooling Capacity (2 Units)
    Power DistributionPower ArchitectureDual Power Input, Dual Power Output
    Input Power Supply380 VAC, 50 Hz
    UPS SolutionExternal UPS (Customer Supplied)
    Backup Runtime300 kW / 15 Minutes (Battery storage period without charging shall not exceed 90 days; otherwise, recharge is required)

     

    Monitoring System

     

    Monitoring InterfaceLocal 15.6-inch Touchscreen, Web Portal, Client Software, Mobile App
    Equipment & Environmental MonitoringAir Conditioning, Power Distribution, UPS, Temperature & Humidity, Leak Detection, Smoke Detection, Door Status, Fire Protection Integration
    Intelligent Monitoring FunctionsBattery Inspection, Video Surveillance, Electronic Access Control, Asset Management, Capacity Management, Intelligent Environmental Linkage, Multi-Site Centralized Management, GPS Positioning Management, 3D Visualization
    Fire Protection SystemFire Suppression MethodAutomatic FM-200 (Heptafluoropropane) Fire Suppression System
    Fire Activation MethodsSmoke Detection, Heat Detection, Fire Alarm System, Emergency Manual Release Button, Post-Fire Ventilation & Smoke Exhaust System, Early Smoke Detection Warning System (Optional)

     

    Features of a 20-Foot Container Data Center

    Optimized for NVIDIA Systems

    This solution is fully compatible with a range of NVIDIA’s powerful server models, including GB300/GB200, B300/B200,  H100/H200, Pro6000 ensuring that the containerized system can seamlessly support high-performance computing tasks, AI workloads, and other demanding applications that leverage NVIDIA’s cutting-edge technology.

     

    Advanced Thermal Management & Energy Efficiency

    Designed to handle extreme heat dissipation, the system supports direct-to-chip and immersion liquid cooling architectures, ensuring the stable operation of high-power servers while dramatically reducing cooling energy consumption compared to traditional air-cooled data centers. The advanced liquid cooling mechanism provides targeted thermal management, lowering operational costs and improving system performance.

     

    Fully Integrated for Quick Deployment

    The fully integrated containerized data center includes power distribution, cooling systems, monitoring, fire protection, and security, allowing for rapid on-site deployment with minimal construction requirements. With factory pre-assembly and testing, this solution guarantees consistent quality, reduced deployment risk, and significantly shortened time to operation.

     

    This containerized data center is particularly well-suited for edge computing, AI clusters, cloud expansion, and remote or temporary deployments. Its compact design and ability to deliver both high-density and high-efficiency performance make it a perfect fit for modern AI-driven infrastructure needs.

     

     

     

    The Advantages of Liquid-Cooled Containerized Data Center

    Data center containers offer several key advantages over traditional brick-and-mortar data centers:

    • Speed to Deployment: Containers can be manufactured and deployed significantly faster than traditional data centers, allowing you to get your infrastructure up and running quickly.
    • Scalability: You can easily add more containers as your needs grow, allowing you to scale your data center capacity on-demand.
    • Cost-Effectiveness: Containers are often more cost-effective than building a new data center, especially for smaller deployments.
    • Flexibility: Containers can be deployed in a variety of locations, including remote areas, rooftop installations, and temporary sites.
    • Energy Efficiency: Many containers are designed for high energy efficiency, helping you reduce your operational costs and environmental impact.
    • Disaster Recovery: Containers can be used to quickly deploy temporary data center capacity in the event of a disaster.

     

    Why Liquid Cooling + Containerization?

    MetricTraditional Air-Cooled Data CenterLiquid-Cooled Container
    Max Rack Density10–15kW/rack (airflow-limited)100kW+/rack
    PUE (Power Usage Effectiveness)1.5–1.8As low as 1.05
    Deployment Timeline12–24 months (construction + permits)4–6 weeks (factory to production)
    Energy EfficiencyBaseline30–50% less energy vs. air cooling
    Space EfficiencyConventional footprint90% space reduction possible
    On-Site InstallationExtensive civil + mechanical workPlug & Play — just connect power and water
    Environment ImmunitySensitive to dust, humidity, temperatureSealed system — immune to dust, 50°C ambient
    Total Cost of Ownership (TCO)Baseline25–40% lower TCO

     

     

    Key Components of Data Center Containers

    Data center containers typically include the following components:

    • Power Distribution: Integrated power distribution units (PDUs) and uninterruptible power supplies (UPSs) to ensure reliable power delivery.
    • Cooling Systems: Air conditioning and ventilation systems to maintain optimal temperatures for your IT equipment.
    • Racking Systems: Specialized racking systems to house your servers, storage devices, and networking equipment.
    • Fire Suppression: Integrated fire suppression systems to protect your valuable equipment in the event of a fire.
    • Security: Physical security measures, such as locking doors and security cameras, to prevent unauthorized access.
    • Monitoring and Management: Advanced monitoring and management systems to oversee the health and performance of your data center container.

     

     

    Use Cases

    • AI & Large-Scale Model Computing
    • High-Performance Computing (HPC)
    • Edge Computing & Telecommunications
    • Energy, Industrial & Remote Environments

     

    Lian Li Liquid-Cooled Data Center Container Services

    • Site Assessment and Planning: Assistance with evaluating deployment sites and planning the installation of data center containers.
    • Customization and Integration: Customizing data center containers to your specific requirements and integrating them with your existing infrastructure.
    • Installation and Commissioning: Professional installation and commissioning services to ensure a smooth deployment
    • Maintenance and Support: Comprehensive maintenance and support services to ensure the smooth operation of your data center containers.


    Contact us today to learn more about our data center container solutions. Our team of experts is ready to help you find the right solution for your business.

     

    Return And Exchange Policy:

    1. Domestic customers: Within 7 days of receiving the goods, our quality department confirms that it is a product quality problem;
    2. Overseas customers: Within 15 days of receiving the goods, our quality department confirms that it is a product quality problem;
    3. The outer packaging is damaged, and abnormalities occurring during transportation are not within the scope of return or exchange (please contact the freight company for claim settlement, and our company can assist with claim settlement);
    4. We only provide after-sales service to customers who purchase directly. If you purchase our products from a dealer or a third party, please contact the seller for after-sales service;
    5. The product cannot be disassembled after receipt, and cannot be modified or repaired without our permission. Keep the outer packaging and keep the labels intact, otherwise no after-sales service will be provided.

Recommend for you


BITMAIN Antminer S21 Hyd 335T Hydro Cooling Miner

$

~

$


Antminer S21 hyd Specifications| 335T | 5360W | 16.0J/T

WhatsMiner M53 M53S M53S+ M53S++ 260TH/S 270TH/S 300TH/S 340TH/S Hydro Cooling

$

~

$


Whatsminer M53: high-performance hydro mining machine

BITMAIN Antminer S19 Pro+Hyd 191T 5252.5W

$

~

$


Antminer S19pro+hyd Specifications|198T | 5445W | 27.5J/T

WhatsMiner M63 M63s 390TH/S hydro cooling

$

6732

~

$

6732


Whatsminer M63: high-performance hydro mining machine
< 1...141516...31 >