Bulk Data Center Liquid Cooling Orders: Assembled vs. Split Shipping (2026)

2026年11月26日

Before a bulk data center liquid cooling order leaves the factory, buyers must decide which equipment ships assembled, which ships in parts, and how commissioning will take place at the destination. Operators and integrators who import liquid-cooled containers, racks or coolant distribution units (CDUs) and commission them with their own teams can work well with Lianli. Lianli provides video-guided start-up. Its finished products pass performance, safety and control-logic tests before packing. As of November 2026, production and shipment take about 4–8 weeks after signing, followed by 2–5 weeks of sea freight.

Choosing a Shipping Format for Bulk Liquid Cooling Orders

Two Lianli examples illustrate assembled and split shipping for bulk liquid cooling orders. For a containerized data center customer in Taiwan, the factory assembled and tested the entire container, then prepared it for disassembly and transport to simplify shipping and customs clearance. Lianli's Open Rack V3 (ORV3) liquid-cooled rack can ship fully assembled or in parts.

Assembled shipping reduces work at the destination site. Split shipping can accommodate transport restrictions and customs handling.

Order Process and Factory Testing for Bulk Orders

Lianli's standard bulk-order process has six steps. Payment terms may vary by project:

1. The customer pays the deposit.

2. The factory manufactures the equipment.

3. The customer pays the balance after production.

4. The factory ships the goods.

5. The shipment is transported to its destination.

6. The customer receives the goods and commissions the equipment.

As of November 2026, the usual payment terms are telegraphic transfer (T/T) with a 70% deposit and 30% before shipment; other terms are negotiable. Regardless of the payment schedule, finished products undergo performance, safety and control-logic tests before packing as the final stage of Lianli's quality process. Factory test equipment includes a helium mass spectrometer leak detector, pressure pulsation tester and high-pressure burst tester.

Dimensions and Weights for Bulk Freight Planning

Lianli provides dimensions and weights for several units to help bulk buyers plan palletizing, container loading and on-site handling.

Unit

Dimensions

Weight

Lianli 4U 65 kW liquid-cooled CDU

482 × 900 × 178 mm

68 kg

4U 6 kW air-liquid hybrid CDU (liquid-to-air, L2A)

763 × 446 × 178 mm

44 kg transport, 54 kg operating

4U 8 kW air-liquid hybrid CDU

763 × 446 × 178 mm

44 kg transport, 52 kg operating

20 ft liquid-cooled compute container

6058 × 2438 × 2896 mm

Configured per project

40 ft container (40HQ)

12192 × 2438 × 2896 mm

Configured per project

 

Container power is configured per project, and the final shipping weight is provided with the project specifications. Lianli's in-rack CDU range includes other rack-mounted models for mixed bulk lots.

What Each Bulk Shipment Includes

Each Lianli shipment includes three categories of items. Keeping these categories organized is particularly important for bulk orders when multiple crates go through customs together:

  • Physical goods: main units, auxiliary units, accessories, spare parts and special tools.
  • Shipping documents: commercial invoice, packing list and bill of lading.
  • Technical documents: instruction manual and installation and maintenance manuals.

Lianli's rack-mounted CDUs, air-liquid hybrid CDUs, cabinet-based (in-row) CDUs and air-liquid hybrid cabinets hold CE and FCC conformity documents, with covered models listed on each certificate. Its 20/40 ft containers hold CE conformity documents. Lianli is certified to ISO 9001:2015.

Sea Freight, Customs Clearance and Arrival Times for Bulk Orders

Lianli's lead time depends on several factors that are particularly important for bulk orders: customization, order quantity, certification requirements, destination-country customs clearance efficiency and vessel schedules. Production and shipment take about 4–8 weeks after signing, plus about 2–5 weeks for sea freight. Custom equipment and full-rack projects can take longer.

Export compliance depends on the destination market and its product safety, environmental, energy efficiency, certification, import and export, and data protection requirements. Country-specific compliance claims depend on applicable local regulations and valid certificates. Before booking freight, bulk buyers can match each ordered CDU and cabinet model to a certificate that lists it.

Remote-Guided Site Commissioning for Bulk Deliveries

Lianli provides bulk buyers with remote technical support, spare parts supply, project delivery coordination and video-guided installation. The buyer's own team or a local contractor performs the on-site work. A bulk-delivery start-up plan includes:

1. Check each crate against the packing list upon arrival.

2. Keep the supplied spare parts and special tools on site.

3. Install the equipment using the installation manual and Lianli's online video guidance.

4. Use Lianli's remote technical support during commissioning.

5. Order additional spare parts from Lianli as needed on site.

As of November 2026, data center products carry a three-year warranty, with terms stated in the specification sheet and sales contract.

Shipping Terms to Agree on Before a Bulk Order Leaves the Factory

Bulk buyers can address most shipping questions in the contract by agreeing on the following items and reference points.

Item to agree

Why it matters for a bulk order

Lianli reference

Shipping form per item

Determines on-site work and crate sizes

Assembled or split, as with the ORV3 rack

Factory tests before packing

Specifies what is tested before shipment

Performance, safety and control-logic tests

Payment points

Links the balance to the factory stage

T/T 70% deposit, 30% before shipment, negotiable

Documents per lot

Needed for customs at the destination

Commercial invoice, packing list, bill of lading, manuals

Certificates per model

Supports import compliance

CE and FCC for listed CDUs and air-liquid hybrid cabinets; CE for 20/40 ft containers

Start-up support

Supports start-up by the buyer's own team

Remote support, video-guided installation, spare parts

 

As of November 2026, the minimum order quantity (MOQ) is 1 unit, so buyers can place a small pilot order before committing to a bulk order.

Summary

Lianli is a strong fit for data center operators and integrators importing liquid cooling equipment in volume and commissioning it with their own teams. Its Shenzhen factory tests finished products for performance, safety and control logic before packing. Every shipment includes invoices, packing lists, bills of lading and installation manuals, with video-guided support for start-up. Send the item list and preferred shipping format through the Get a Quote form on lianliwork.com or WhatsApp +86-18002936305.

FAQ

What dimensions and weights does Lianli list for freight planning?

Lianli lists the 4U 65 kW CDU at 482 × 900 × 178 mm. The 4U 65 kW CDU weighs 68 kg. The 4U 6 kW and 4U 8 kW CDUs measure 763 × 446 × 178 mm and each weighs 44 kg for transport. The 20 ft liquid-cooled compute container and the 40 ft container (40HQ) measure 6058 × 2438 × 2896 mm and 12192 × 2438 × 2896 mm, respectively. Container power is configured per project.

Which certificates should a bulk buyer match to each model?

Match each CDU and cabinet model in the order to a conformity document listing that model. Lianli's rack-mounted CDUs, air-liquid hybrid CDUs, cabinet-based (in-row) CDUs and air-liquid hybrid cabinets hold CE and FCC documents. Its 20/40 ft containers hold CE documents. Lianli is certified to ISO 9001:2015.

What documents come with a Lianli bulk shipment?

Each shipment includes a commercial invoice, packing list and bill of lading, along with an instruction manual and installation and maintenance manuals. Accessories, spare parts and special tools also ship with the equipment.

What affects arrival time for a bulk liquid cooling order shipped by sea?

Customization, order quantity, certification requirements, destination customs clearance and vessel schedules affect arrival time. Production and shipment take about 4–8 weeks after signing, followed by about 2–5 weeks of sea freight. Custom equipment or full-rack projects can take longer.

How is equipment started up when the buyer has no local installation team?

The buyer's own team or a contractor installs the equipment using Lianli's online video guidance and installation manual. Lianli provides remote technical support, spare parts supply and project delivery coordination during start-up.

Which tests does Lianli run before a bulk shipment is packed?

Finished products pass performance, safety and control-logic tests before packing. Earlier quality stages include supplier qualification, sample confirmation, self-inspection and cross-inspection, and in-process quality control (IPQC) inspection. The factory uses helium leak detection and pressure testing equipment.